With good living conditions, people have begun to improve their living environment, making construction site piling machines a hot market. Shandong Hengwang Group reminds everyone to follow accurate and standardized operating procedures when constructing buildings and commercial structures. Do not take it lightly.
1. Check the performance of the entire construction site for the piling machine, whether there are any abnormal sounds, and if the piling machine is in the best condition for construction.
2. The first step is to check the geology, determine the construction plan, drill bit model, drilling speed, etc. The first rod should be drilled slowly to avoid damaging the drill bit and creating an eccentric hole if the soil is too hard.
3. To avoid drill bit quality issues due to non-standard drilling, please check if the drill bit is worn, causing shrinkage, deviation, and other drilling faults.
After inspection, the construction site piling machine can be ready for smooth construction, ensuring construction efficiency and quality.
Please fill out the form below according to your needs, and a Hengwang product specialist will contact you within one day.