Knowledge

Oct 23, 2019

Precautions for Using a Guide Rod Diesel Hammer Pile Driver

1. Operators must closely monitor their stations and pay close attention to the operation of the diesel hammer, addressing any issues promptly.


2. A certain proportion of lubricating oil should be added to the diesel in the fuel tank to facilitate the lubrication of the cylinder hammer and piston.


3. Operators should adjust the fuel supply based on the varying piling resistance at the construction site for more effective operation.


4. During piling, the wire rope on the winch should be loosened at all times to prevent it from breaking when the pile hammer enters the soil.


5. When using a guide rod diesel pile hammer for the first time, the bounce height should not be too high. Once stabilized, it should be gradually increased.


Back to top

Request a quote

Please fill out the form below according to your needs, and a Hengwang product specialist will contact you within one day.

All products come with a 12-month warranty!