Knowledge

Dec 05, 2019

What to Do if a Shandong Pile Driver Overheats

Shandong pile drivers are a type of construction machinery commonly used in construction. After long-term use, the pile hammer is especially prone to overheating, which can cause damage to other parts. How can this issue be addressed? Let's briefly introduce the content below.


1. Remove the fuel pump oil pipe of the pile driver, drain water until diesel flows out, exhaust the fuel pump completely, set the fuel pump to the zero position, remove the cylinder locking screws, lift the landing gear and the upper piston, vent several times, release the water inside the cylinder, and install the locking screws.

2.. Set the fuel pump of the pile driver back to the neutral position, lift the upper piston, and idle it several times until the penetration depth of the pile is within the normal range, and the hammer can start normally; do not use summer diesel in winter, as this can cause the wax in the diesel to separate, clogging the oil passages, and gasoline should not be used.

3. Operate the pile driver correctly according to the standard procedures, and pay attention to the daily maintenance of the pile driver. Even if there are heating issues, they can be resolved using the methods described above.


Back to top

Request a quote

Please fill out the form below according to your needs, and a Hengwang product specialist will contact you within one day.

All products come with a 12-month warranty!