Knowledge

Dec 26, 2019

Construction Conditions of the Excavator Pile Driver Construction Scheme

The so-called difficulty at the beginning of everything means that everything must be prepared and implemented with a plan. Buildings should lay a good foundation for the construction of high-rise buildings, so preparation should also be made when using excavator pile drivers for construction schemes. Today, let's talk about the construction conditions of pile drivers. If construction is to be undertaken, materials and drawings must first be available. This means geological materials, floor plans, and construction drawings. According to the plan, clear the ground within the pile foundation range, all obstacles on the ground and above the ground. Take anti-seismic measures, level and compact the site to ensure the smooth progress of the pile body; set the axis and horizontal piles of the pile foundation, determine the position of each pile, erect positioning piles, make markings, and select and determine according to the plan. Good access route and sequence of pile driving; for observing the pile driver as well as the installation of lifting tools, water pipes, and wires, the soil depth, place a ruler on the frame of the pile driver's file. The first test file should have no fewer than two test files. Check the quality of the piles and determine the length of the piles, the piles used should be stacked near the pile driver according to the plan. The filing process and technical measures must meet the requirements, finally, all records of the excavator pile driver construction scheme must be individually recorded and managed. Successfully complete your project, reduce waste, and avoid accidents.


Back to top

Request a quote

Please fill out the form below according to your needs, and a Hengwang product specialist will contact you within one day.

All products come with a 12-month warranty!