Knowledge

Apr 28, 2020

How to perform maintenance on a steel guardrail pile driver

The average daily loss of a steel guardrail pile driver is significantly higher than the daily loss of a road pile driver. The steel guardrail pile driver is checked weekly, and the frequency of checks varies according to construction conditions, but the content of the checks is the same. First, check the air filtration system, open the air filter and cover, and clean the dust inside the air filter box. Remove the filter element and use an air gun to clean the dust inside the filter element. The filter element should be replaced after 3-5 uses. After checking the air filter, check the diesel and hydraulic oil. Each type of oil has a special filter element. The filter element is replaced once a month and can be cleaned during this period. However, if damage is discovered during road construction, it should be replaced accordingly. A magnet is placed in the hydraulic oil tank and diesel tank to absorb iron filings in the tank, preventing iron filings from entering the oil circuit and damaging hydraulic components. Then, the magnet should be removed and cleaned during each check. This detail is our unique method aimed at ensuring the quality and service life of the machine.


What factors affect the lifespan of a steel guardrail pile driver?


The design and manufacturing of a steel guardrail pile driver determine the general lifespan of the machine. As technology advances, the materials used in steel guardrail pile drivers are also being updated continuously. Materials with high strength and wear resistance are selected to analyze the stress capacity of the bearing parts of the construction site pile driver. Maintainability, simplified assembly and disassembly, centralized use of oil, and electronic technology to monitor temperature, vibration, load, etc., are considered. Oil-less bearings are used for oil-less lubrication, extending the lubrication cycle can effectively reduce maintenance, suitable for common parts of common wear parts purchase, and minimize maintenance items in the design of steel guardrail pile drivers as much as possible.


Proper use of the steel guardrail pile driver is key to extending its lifespan. It adheres to the principles of fixing machinery and maintenance. Pre-job training for pile driver operators to understand the structure, principle, and performance of the steel guardrail pile driver, fully utilize the pile driver checks and troubleshoot to ensure the pile driver operates normally and smoothly. Road drilling machines can also reduce downtime and lower costs. Since construction occurs in an open and constantly changing environment, attention must be paid to the environment. Factors affecting the steel guardrail pile driver and necessary protective measures should be taken.


Back to top

Request a quote

Please fill out the form below according to your needs, and a Hengwang product specialist will contact you within one day.

All products come with a 12-month warranty!