What preparatory work should be done in advance before the construction of a crawler-type long spiral pile driver?

1. The electric pole pile driver product is suitable for drilling operations in electric pole digging, street lamp poles, photovoltaic brackets, and residential piling projects. It is a multi-purpose vehicle, using a commonly used loader as the carrier, with a front-mounted drilling approach that does not damage the loader's transport function, and is applicable to various soil layers.


2. The electric pole pile driver is convenient and flexible to operate, has a wide range of applicability, strong mobility, high construction efficiency, and low cost, making it popular among both new and old users. The new type of drilling and hoisting integrated machine can lift up to 5 tons and drill holes 1-10 meters deep. A single person can complete the work, greatly improving work efficiency.


3. Before construction with an electric pole pile driver, it's essential to understand the construction conditions and tasks from the construction personnel, as well as any issues that should be noted during construction. Check whether the insulation of cables and wires is good. Check whether the controller contacts are good and the limits are correct. Verify that the power supply voltage meets the requirements. Lubricate and maintain each part according to daily maintenance tasks.


4. When the pile driver is working, check daily whether the flange bolts of the power head or vibrating hammer, and the bolts and nuts of the operating mechanism are loose; when the diagonal brace rotates, observe whether there is any swinging. If there is swinging, replace the copper guide sleeve or copper nut in the diagonal support; check whether the internal lubrication oil reaches the specified oil level.