Knowledge

Jan 11, 2021

The solar photovoltaic crawler pile driver's drilling frame may fail to rise or lower due to the following reasons

The solar photovoltaic crawler pile driver's drilling frame may fail to rise or lower due to the following reasons:

Symptom: During the operation of the pile driver, when the multi-way valve is operated, the drill frame does not move, or it can rise but not lower, or it can lower but not rise, or there is no action at all.


Reasons:

Insufficient hydraulic oil in the hydraulic oil tank.

Hydraulic system pressure is too low.

Blockages in the oil pipe or multi-way valve and hydraulic lock.

The hydraulic cylinder extends beyond its range of travel.


Solutions:

Refill or replace the hydraulic oil.

Adjust the system pressure.

Clean the oil pipe, multi-way valve, and hydraulic lock.


Back to top

Request a quote

Please fill out the form below according to your needs, and a Hengwang product specialist will contact you within one day.

All products come with a 12-month warranty!