Maintenance and Care of the Hydraulic Pump in a Guardrail Piling Machine During Operation
As a manufacturer of guardrail piling machines, let's learn together how to maintain and service these machines during operation!
1. Pre-operation checks for the hydraulic pump:
2. Ensure the hydraulic pump is installed accurately and securely, check if the screws are tightened, and verify if the coupling is installed according to requirements.
3. Check if the pump body is filled with oil.
4. Confirm that the pump's rotation direction corresponds with the inlet and outlet oil ports.
5. Verify if the safety valve in the hydraulic system is adjusted to the prescribed pressure value.
6. Points to note during the operation of the hydraulic pump:
7. Avoid abruptly starting at full speed. Instead, jog the prime mover switch several times in a system unloading state before continuous no-load operation. The purpose is to clear as much air as possible from the pipelines. After no-load running for 1-2 minutes without any abnormality, gradually apply load. During the loading process, ensure there are no abnormal vibrations, noise, or leaks; otherwise, immediately stop the machine for inspection, analysis, and fault repair.
8. Post-operation maintenance of the hydraulic pump:
9. If the pump is not to be used for an extended period, drain the oil from the pump, then refill it with oil having a lower acid value. Coat any exposed machined surfaces with anti-rust oil, and seal all oil ports with screw plugs to prevent contamination.