The corrugated guardrail pile driver is a large piece of construction machinery. In complex construction environments and under the influence of weather, special attention needs to be paid to the maintenance of the machine's battery to avoid starting difficulties and unnecessary project losses due to other electrical faults.
To properly maintain the battery of a corrugated guardrail pile driver, the following suggestions should be considered:
1. Always keep the battery of the corrugated guardrail pile driver fully charged to prevent electrolyte density reduction, freezing, casing cracking, plate bending, and active material shedding.
2. Minimize the relative density of the electrolyte in the corrugated guardrail pile driver's battery to prevent freezing.
3. Check the electrolyte level of the battery before and after using the corrugated guardrail pile driver, and add distilled water when necessary. Adding distilled water to the battery should only be done when fully charged, to mix the distilled water with the electrolyte more quickly and reduce the possibility of the distilled water freezing.
4. Due to reduced battery capacity in winter, preheat the corrugated guardrail pile driver before cold starting. The starting time of the starter motor should not exceed 5 seconds, with intervals of no less than 15 seconds.
5. When the corrugated guardrail pile driver is idle for a long period, insulate the battery.
6. Ensure to clean the battery to remove debris and keep its surface clean.
7. Regularly check if the battery’s stack tray is loose. If it is, tighten it promptly. Continuous research and development have led to the production of a new type of energy-efficient and environmentally friendly fully hydraulic pile driving equipment for corrugated guardrail pile drivers.
Treatment methods for high oil temperature in corrugated guardrail pile drivers:
1. Check if the hydraulic circuit of the corrugated guardrail pile driver is blocked.
2. Change the oil of the corrugated guardrail pile driver. If the oil has deteriorated or is used improperly, the oil temperature can be very high.
3. If the main pump of the corrugated guardrail pile driver is severely worn (basic component failure), replace the rocker arm assembly, pump casing, and plunger.
4. Wrap the hydraulic oil tank of the road guardrail pile driver with an insulating pad. The corrugated guardrail pile driver is a type of high-speed highway guardrail steel pipe pile pressing equipment. It uses diesel power and fully hydraulic mechanical transmission. It features lightweight driving, high piling precision, durability, energy efficiency, and environmental friendliness. It is particularly suitable for the installation, maintenance, and on-site maintenance of highway guardrails.
5. The engine speed of the corrugated guardrail pile driver can also cause high oil temperature.
Please fill out the form below according to your needs, and a Hengwang product specialist will contact you within one day.